EnglishMacedonian
Bucim Clean Up - The Why and How PDF
Bucim mine is an active copper mine. Disposed mining waste rock materials create environmentally hazardous conditions for residents and ecosystems in the local areas.  Acid mine drainage, containing metals and sulphates reach downstream water bodies and pollute the water and soil. Flotation waste materials are discharged in a tail­ings reservoir and with the same material the impounding dam is simultaneously being built. Small dust particles, prone to wind ero­sion are transported by wind and endanger the local population in village of Topolnica. 

The project intervention consists of construction of a system for collection and treatment of the waters from the mining zone and the waste-rock dump and pumping the polluted waters back into the technological process and the tailings reservoir. This prevents release of pollutants downstream, thus eliminating pollution of the rivers and soil.

Also, measures have been undertaken for protection from fugitive dust.  More than 12 ha of biologically inactive bare land have been re-vegetated and a system for irrigation and wetting is under construction. The interventions are designed to prevent dust generation and minimize its propagation. Project interventions in Bucim can serve as an example of public-private partnership for other locations where historical pollution exists and where envi­ronmental liabilities have not been satisfactorily delineated during transformation of the enterprises.
 
Next >
experts_logo.png

About Project

The goal of the 30 months Programme is to improve the environmental situation and quality of life for citizens living in and around polluted areas in the most economical way.karta_mala.gif Vrbas ugljevik tuzla mojkovac bajza Trebca Lojane Bucim

albania-bajza.jpg Bajza - Albania
Clean up the stockpile
of toxic chemicals
albania-bajza.jpg Balez, Elbasan-Albania
clean up the stockpile
of chemical waste
albania-bajza.jpg Reps - Albania
rehabilitation of mine tailing facility
albania-bajza.jpg Rreshen - Albania
rehabilitation of mine tailing facility
bih-tuzla.jpg Tuzla - BiH
Reducing the air-polution
macedonia-bucim.jpg Bucim - Macedonia
Prevention of the future pollution
macedonia-lojane.jpg Lojane - Macedonia
Removal of hazardous waste
montenegro-mojkovac.jpg Mojkovac - Montenegro
Cleaning up the Tailing Mine Impoundment
serbia-vrbas.jpg Vrbas - Serbia
construction of the main waste water collector
kosovo_artana.jpg Trepca, Artana - Kosovo
rehabilitation of mine tailing facility 
kosovo_stari_trg.jpg Trepca, Stari Trg- Kosovo
rehabilitation of mine tailing facility 
You are here  :Regional Office arrow FYR Macedonia