Fugitive Dust Control and Irrigation System PDF

Technical Design - Part 1, comprising intake, pumping station, pipeline and new water resevoir V=300 m3 has been completed.

The design has been financed in parallel by Bucim Mine(part of co-financing). Currently the review of project documentation is ongoing and ToR and tender documents are under preparation for construction works/procurement of equipment.

Part 2 of the design, comprising fixed and mobile irrigation equipment, water cannons for wetitng the dry surfaces, and connection of the existing pipeline with newly designed equipmen/reservoir has been tendered separately in addition.

 