Fugitive Dust Control and Irrigation System PDF

Technical Design - Part 1, comprising intake, pumping station, pipeline and new water resevoir V=300 m3 has been completed.

The design has been financed in parallel by Bucim Mine(part of co-financing). Currently the review of project documentation is ongoing and ToR and tender documents are under preparation for construction works/procurement of equipment.

Part 2 of the design, comprising fixed and mobile irrigation equipment, water cannons for wetitng the dry surfaces, and connection of the existing pipeline with newly designed equipmen/reservoir has been tendered separately in addition.

 
< Prev   Next >
experts_logo.png

About Project

The goal of the 30 months Programme is to improve the environmental situation and quality of life for citizens living in and around polluted areas in the most economical way.karta_mala.gif Vrbas ugljevik tuzla mojkovac bajza Trebca Lojane Bucim

albania-bajza.jpg Bajza - Albania
Clean up the stockpile
of toxic chemicals
albania-bajza.jpg Balez, Elbasan-Albania
clean up the stockpile
of chemical waste
albania-bajza.jpg Reps - Albania
rehabilitation of mine tailing facility
albania-bajza.jpg Rreshen - Albania
rehabilitation of mine tailing facility
bih-tuzla.jpg Tuzla - BiH
Reducing the air-polution
macedonia-bucim.jpg Bucim - Macedonia
Prevention of the future pollution
macedonia-lojane.jpg Lojane - Macedonia
Removal of hazardous waste
montenegro-mojkovac.jpg Mojkovac - Montenegro
Cleaning up the Tailing Mine Impoundment
serbia-vrbas.jpg Vrbas - Serbia
construction of the main waste water collector
kosovo_artana.jpg Trepca, Artana - Kosovo
rehabilitation of mine tailing facility 
kosovo_stari_trg.jpg Trepca, Stari Trg- Kosovo
rehabilitation of mine tailing facility 
You are here  :Regional Office arrow FYR Macedonia