| Fugitive Dust Control and Irrigation System |
|
|
Technical Design - Part 1, comprising intake, pumping station, pipeline and new water resevoir V=300 m3 has been completed. The design has been financed in parallel by Bucim Mine(part of co-financing). Currently the review of project documentation is ongoing and ToR and tender documents are under preparation for construction works/procurement of equipment. Part 2 of the design, comprising fixed and mobile irrigation equipment, water cannons for wetitng the dry surfaces, and connection of the existing pipeline with newly designed equipmen/reservoir has been tendered separately in addition. |
| < Prev | Next > |
|---|
The goal of the 30 months Programme is to improve the
environmental situation and quality of life for citizens living in and
around polluted areas in the most economical way.
FYR Macedonia