| Bucim |
|
|
The proposed intervention under this programme are based on the Environmental Impact Assessment Study for the Mine “Bucim” prepared in June 2006 and are aimed at addressing the historical pollution and prevention of the future pollution in two main respects: 1) by designing a system for collection and treatment of the waters from the mining zone, the tailing pond and the waste-rock dump, thus eliminating the pollution of Topolnicka River and further downstream rivers Bregalnica and Vardar; 2) undertaking measures for protection of air, i.e. approximately 30 ha of the tailing dump will be re-cultivated with the classical methods that include covering the tailings with soil and manual planting of the vegetation. |
| < Prev |
|---|
The goal of the 30 months Programme is to improve the
environmental situation and quality of life for citizens living in and
around polluted areas in the most economical way.
FYR Macedonia